Tool risk reduction measures

100 RISK REDUCTION MEASURES

Risk reducing during cutting and remediation procedures-image

Risk reducing during cutting and remediation procedures

The measure resides in eliminating the risk of forest soil damage due to cutting. Specifically, the measure includes for example use of cable transport systems, caterpillar tractors, and avoidance of transport in the same routes. If damages of the forest soil occur, it is necessary to remediate them immediately in order not to disrupt the natural soil processes. Any remediation activities depend on the specific damages and should be conducted immediately after finalizing the cutting.

  • Description
  • Fields of action
Fields of action Forests